Insulation Procedure

Workers must comply with any reasonable and cooperative policy and procedures. In case of any incidents, please contact the project manager, Jamie 0433 024 079. PERSONNEL MUST NOTIFY THE PROJECT MANAGER IMMEDIATELY IF ANY DISCREPANCY IS FOUND.


Prepared by: Regina Wong

Reviewed by: Jamie Dong

Date: 5 May 2023




#1 - Preparation

Check onsite material is same as purchase order and delivery docket.

Please take a photo of onsite material and send to Regina via 0433 799 357 or orders@drywallwa.com.au



#2 - Checking and Confirmation

Please separate walls and ceilings batts.

Please ensure not cutting is allowed on polished concrete tiles.



#3 - Install Ceiling and Wall Batts

Ensure ceiling batts cover all the ceiling area according to the ceiling plan- make sure the batts are installed above the ceiling's batten. All cable must be below the ceiling batts.


If the batts tends to fall off, please use insulation strap.







Ensure both external and internal wall batts overs all wall area- ensure the wall batts are installed above the wall joints.








#4 - Cleaning up

Ensure all off cut are wrapped in bags, and thrown in designated bin or drop of zone.